Intel Manufacturing in Kulim, Malaysia, and San Jose, Costa Rica (B-Roll) | Videos & Movies on Vimeo

Intel Manufacturing in Kulim, Malaysia, and San Jose, Costa Rica (B-Roll)

B-roll footage from May 2024 shows the Intel Kulim Assembly Test (KuAT) facility in Kulim, Malaysia, and the Costa Rica Assembly Test (CRAT) facility in San Jose, Costa Rica. It includes Intel employees inside the facilities and video of Intel Xeon 6 processors with Efficient-cores (code-named Sierra Forest). (Credit: Intel Corporation)

Uploaded on May 30, 2024 at 4:04 pm

Watch on Vimeo


More from Intel Newsroom

Intel Ohio One Campus Video Rendering

Intel Vision 2024 (B-Roll)

President Joe Biden, Intel CEO Pat Gelsinger Tour Arizona Semiconductor Factory (B-Roll)

Intel US Construction, Manufacturing and Advanced Assembly Test Manufacturing (B-Roll)

Intel Ohio Fab Construction (B-Roll)

Intel Oregon D1D/D1X Fab with Planar (B-Roll)

Intel Oregon D1D/D1X Fab with Extreme Ultraviolet Technology (B-Roll)

Intel Oregon MSB Fab with Foveros Advanced Packaging (B-Roll)

Intel Arizona Fab 52 and Fab 62 Construction (B-Roll)

Intel Advanced Packaging in New Mexico’s Fab 9, Manufacturing in Fab 11X (B-Roll)

5th Gen Intel Xeon Scalable Processors Manufacturing (B-Roll)

Oregon Gov. Tina Kotek Visits Oregon's D1X, Oct. 2023 (B-Roll)